U.S. property planning · free browser tool

Can this lot fit a septic system and a private well?

Turn your measured clearances into a practical pre-permit screen. Check the CDC well-separation baseline, compare your property against local minimums you know, and leave with a clean list of what still needs official verification.

✓ No account✓ Runs in your browser✓ EPA + CDC sourced
Source-first: EPA says household onsite systems are regulated by states, tribes and local governments; CDC gives a 50-ft well-siting baseline from septic tanks and leach fields. See sources and limits.

Property screen

Enter the lot you actually have.

Sample values are prefilled so you can see how the tool works. Replace them with field measurements or a survey/site plan. Distances are horizontal planning measurements in feet.

Planning screen — not a permit decision.Local rules can be stricter and can vary by county, soil, system type, slope, floodplain, water-table depth and waterbody classification.

1. Property context

2. Measured clearances

3. Local minimums, if you have them

Leave a field blank if you do not know the official local requirement. The result will mark it “verify” rather than inventing a number.

Permit-readiness checklist

Distances are only one part of siting.

Tick what you already know. This checklist is saved only in your browser.

0 of 6 known

Why this screen is different

No fake “national septic code.”

EPA states that individual onsite systems are regulated by states, tribes and local governments. A single universal setback table would be misleading.

One real federal health baseline

CDC advises placing a private well at least 50 feet from septic tanks and septic leach fields. We screen that explicitly, while still telling you to check stricter local rules.

Understand the 50-ft well check →

Your local numbers stay local

If you know your county’s minimum to a property line, foundation, waterbody or traffic area, enter it. The tool compares it without pretending that number applies nationwide.

Plan the other setbacks →

Unknowns become a to-do list

Missing rule? The result says “verify” and points you toward the state/local authority. That is more useful than a confident but wrong pass/fail.

Find the regulator path →

Useful before money changes hands

Three times to run the screen.

01

Before buying land

Use a survey or listing map to spot whether the well, house, drainfield and reserve area are competing for the same space.

02

Before an addition or pool

New structures can consume setback or repair-area space even when the existing septic system works today.

03

Before making an offer

Turn inspection notes and measured distances into specific questions for the seller, inspector and local permitting office.

Important limit

A passing screen is not approval.

Soil treatment capacity, vertical separation to groundwater or limiting layers, slope, system technology, reserve area, local design flow and permit history can change what is allowed. Use Dakiv to organize the facts, then use the official permit process to decide the site.

EPA’s direction is straightforward:

Contact the local permitting authority for site-specific septic requirements and required setbacks.

Read EPA septic FAQs ↗