FL ยท statewide rule ยท verified November 5, 2026
Florida septic setback requirements
In Florida, the septic tank must sit at least 75 ft and the drainfield at least 75 ft from a private well, the drainfield at least 5 ft from the house and 5 ft from the property line. Source: Rule 62-6.005, F.A.C. (formerly 64E-6.005) โ. Measure your lot below to see what clears and what does not.
Free lot check
Test your measurements against Florida minimums
Enter the distances you measured or read off the site plan. Leave unknown ones blank. Nothing is uploaded.
| Distance to | Septic tank | Drainfield |
|---|---|---|
| Private well | 75 ft | 75 ft |
| House / foundation | 5 ft | 5 ft |
| Property line | 5 ft | 5 ft |
| Surface water | 75 ft | 75 ft |
Rule notes
- Setbacks apply to the whole system; systems may not sit under buildings.
- Public drinking-water wells: 100 ft (โค2,000 gpd) or 200 ft (>2,000 gpd).
- Surface water is measured laterally from the water body boundary.
Citation: Rule 62-6.005, F.A.C. (formerly 64E-6.005) ยท Florida Administrative Code 62-6.005 โ ยท Verified against the rule text on November 5, 2026. Spotted a change? Tell us.
Context
How Florida compares with other states
- Septic tank โ private well: 75 ft is above the 50 ft median of 30 tracked states. It is stricter than CDC's 50-ft siting guidance.
- Drainfield โ private well: 75 ft is below the 100 ft median of 31 tracked states. It is stricter than CDC's 50-ft siting guidance.
- Septic tank โ house: 5 ft is the smallest minimum among the 30 states Dakiv tracks.
- Drainfield โ house: 5 ft is the smallest minimum among the 32 states Dakiv tracks.
- Septic tank โ property line: 5 ft is below the 10 ft median of 30 tracked states.
- Drainfield โ property line: 5 ft is the smallest minimum among the 32 states Dakiv tracks.
- Septic tank โ surface water: 75 ft is above the 50 ft median of 25 tracked states.
- Drainfield โ surface water: 75 ft is above the 50 ft median of 30 tracked states.
Before you rely on a number
The permit office has the last word.
These are statewide minimums transcribed from Rule 62-6.005, F.A.C. (formerly 64E-6.005). Counties, health districts and local boards in Florida can require more, and special cases โ public wells, shoreland, sensitive aquifers or larger flows โ use other distances. Get the approved site plan or as-built for an existing system before you buy, build or add on.
Start with the state program listed in EPA's directory, then confirm the county or district office.
Open the Florida permit finderQuick answers
Florida septic setback questions
How far does a septic system have to be from a well in Florida?
Under Rule 62-6.005, F.A.C. (formerly 64E-6.005), the septic tank must be at least 75 feet from a private well and the drainfield at least 75 feet. These are statewide minimums for a private drinking-water well; public wells and local health departments can require more. CDC's national siting guidance is 50 feet.
How close can a septic tank be to a house in Florida?
The statewide minimum distance to the house or foundation is 5 feet for the septic tank and 5 feet for the drainfield. Check the notes on this page for basement, crawl-space or footing-drain cases, which often need more room.
How close to the property line can a septic system be in Florida?
Florida's statewide rule sets 5 feet for the tank and 5 feet for the drainfield from the property line. Easements, neighbouring wells and local ordinances can push the system further in.
How far must a septic system be from a lake or stream in Florida?
The statewide minimum to surface water is 75 feet for the tank and 75 feet for the drainfield. Shoreland, watershed and drinking-water-supply areas often carry larger buffers.
Can my county require larger septic setbacks than Florida's state rule?
Yes. These are statewide minimums. County health departments, districts and local boards can adopt stricter distances, and the permit office that controls your parcel has the final say. Use the permit finder to reach it before you buy, build or add on.