MT ยท statewide rule ยท verified November 5, 2026

Montana septic setback requirements

In Montana, the system must sit with the drainfield at least 100 ft from a private well, the drainfield at least 10 ft from the house and 10 ft from the property line. Source: ARM 17.36.323, Table 2 โ†—. Measure your lot below to see what clears and what does not.

Private well100 ftdrainfield
House / foundation10 ftdrainfield
Property line10 ftdrainfield
Surface water100 ftdrainfield

Free lot check

Test your measurements against Montana minimums

Enter the distances you measured or read off the site plan. Leave unknown ones blank. Nothing is uploaded.

Enter at least one distance.Each row turns green when it clears the statewide minimum and red when it falls short.
Run the full property screen with Montana rules โ†’
Montana statewide minimum horizontal setbacks in feet (verified 2026-11-05)
Distance toSeptic tankDrainfield
Private wellverify locally100 ft
House / foundationverify locally10 ft
Property lineverify locally10 ft
Surface waterverify locally100 ft

Rule notes

  • Sealed components (such as tanks) need 50 ft from individual and shared wells; check DEQ-4 for which components count as sealed.
  • A smaller source-specific well isolation zone approved under DEQ-20 can replace the 50/100 ft well setbacks.
  • Surface water excludes intermittent storm water; waivers are possible under ARM 17.36.601.

Citation: ARM 17.36.323, Table 2 ยท Administrative Rules of Montana 17.36.323 โ†— ยท Verified against the rule text on November 5, 2026. Spotted a change? Tell us.

Context

How Montana compares with other states

  • Drainfield โ†’ private well: 100 ft is the largest required distance among the 31 states Dakiv tracks. It is stricter than CDC's 50-ft siting guidance.
  • Drainfield โ†’ house: 10 ft is equal to the 10 ft median of 32 tracked states.
  • Drainfield โ†’ property line: 10 ft is the largest required distance among the 32 states Dakiv tracks.
  • Drainfield โ†’ surface water: 100 ft is the largest required distance among the 30 states Dakiv tracks.

No single statewide value in the cited rule for: septic tank โ†’ private well, septic tank โ†’ house, septic tank โ†’ property line and septic tank โ†’ surface water. Ask the local permit office.

Before you rely on a number

The permit office has the last word.

These are statewide minimums transcribed from ARM 17.36.323, Table 2. Counties, health districts and local boards in Montana can require more, and special cases โ€” public wells, shoreland, sensitive aquifers or larger flows โ€” use other distances. Get the approved site plan or as-built for an existing system before you buy, build or add on.

Find who permits septic systems for your parcel.

Start with the state program listed in EPA's directory, then confirm the county or district office.

Open the Montana permit finder

EPA state program contact โ†—

Quick answers

Montana septic setback questions

How far does a septic system have to be from a well in Montana?

Under ARM 17.36.323, Table 2, the drainfield at least 100 feet. These are statewide minimums for a private drinking-water well; public wells and local health departments can require more. CDC's national siting guidance is 50 feet.

How close can a septic tank be to a house in Montana?

The statewide minimum distance to the house or foundation is 10 feet for the drainfield. Check the notes on this page for basement, crawl-space or footing-drain cases, which often need more room.

How close to the property line can a septic system be in Montana?

Montana's statewide rule sets 10 feet for the drainfield from the property line. Easements, neighbouring wells and local ordinances can push the system further in.

How far must a septic system be from a lake or stream in Montana?

The statewide minimum to surface water is 100 feet for the drainfield. Shoreland, watershed and drinking-water-supply areas often carry larger buffers.

Can my county require larger septic setbacks than Montana's state rule?

Yes. These are statewide minimums. County health departments, districts and local boards can adopt stricter distances, and the permit office that controls your parcel has the final say. Use the permit finder to reach it before you buy, build or add on.